4 Pasos para Optimizar tu Línea Productiva

1. HÁBLANOS DE TU OBJETIVO

2. TE PROPONEMOS SOLUCIONES

3. ELIGE LA MEJOR OPCIÓN

4. DISEÑAMOS, FABRICAMOS Y TE INSTALAMOS EL EQUIPO

handsome-man
descarga (2)

Prior to upgrading to the SERRAPID system, GBP spent up to 20 minutes changing dies on their traditional bolt-on cylinder. With their new SERRAPID cylinder, GBP is mounting dies in about 1 minute and 10 seconds and setting up for the next run in 3-4 minute.” Green Bay Packaging – Cincinnati, Ohio

almacen-troqueles-3
cilindro troquelador
introductor impresión digital
troqueladora
Impresora-Flexografica
rapidex-rao-z

Stay informed about the latest technological developments